Orientacinė pradžios data
Perkančioji organizacija
Būsena
Pirkimo pavadinimas (EN) Trumpas pirkimo objekto aprašymas (EN) Kategorija Orientacinė pradžios data Perkančioji organizacija Būsena
Directors & Officers liability Insurance TBC Paslaugos Q1 RB Rail AS
Employees Health Insurance TBC Paslaugos Q1 RB Rail AS Announced in March
Global Forum Paslaugos Q1 RB Rail AS Announced in January
Risk Management system and Project Scheduling software solution Common IT platform/system to be used for Project planning and Risk Management needs. Project management solution will provide businesses functionalities for project planning, scheduling and risk management. The tool will secure detailed reporting and project control opportunities including but not limited with earned value management, Critical Path Method analysis,  “what-if” and/or other detailed analysis as well as ability to compare multiple plan versions revised schedules etc. Risk module integrated with project planning tool will provide possibilities to run detailed quantitative risk analysis for both schedule risk and cost risk for each project step and/or project in general. Good/Services Q1 RB Rail AS Announced in March
Study on the maximization of Gross Value Added (GVA) of Rail Baltica international passenger stations The study shall benchmark, analyze and provide policy recommendations towards the promotion and maximization of Gross Value Added (GVA) of the Rail Baltica 7 international passenger stations. The study shall extensively draw on European and global best practices, as well as emerging opportunities stemming from digitalization. The study shall cover the infrastructural, commercial, as well as socio-economic (including catalytic) aspects of GVA promotion. The study is part of the Rail Baltica Commercialization Plan activities. Paslaugos Q1 RB Rail AS
Travel Agency Services Travel Agency services for business trips Paslaugos Q1 RB Rail AS Announced in February
IT services Various IT-services requirements, including purchases from the Latvian electronig procurement (EIS) system Paslaugos Q1-Q4 RB Rail AS
Audit Services 2019-2021 Audit services for RB Rail AS needs from 2019 to 2021 Paslaugos Q2 RB Rail AS
Construction and constructions logistics supply study for Rail Baltica This styudy shall analyze construction tender options, type of contracts, market players availabilities, risks related to split of construction volumes and construction time. Including the Local construction & construction supply logistics studies in LV and LT and pan-baltic study Paslaugos Q2 RB Rail AS
Control, command and signaling (including ERTMS) subsystem procurement and deployment strategy for Rail Baltica The aim of this study is to produce a comprehensive procurement and deployment strategy for Control, command and signaling subsystems (including ERTMS and passenger information systems, bearing in mind that parties to the 30.09.2016 Rail Baltic / Rail Baltica Contracting Scheme Agreement have agreed that the acquisition and deployment of these systems shall be organized by RB Rail using the consolidated procurement procedure. The strategy shall be based on a thorough market and supplier assessment, with a particular emphasis on ensuring optimum interoperability by deploying a single solution along the entire railway line in excess of 700 km, covering all three Baltic countries along the TEN-T North Sea - Baltic Core Network Corridor alignment and having a dynamic deployment schedule. The study shall include, inter alia, supplier market analysis, technical pre-study, procurement and deployment strategy development Paslaugos Q2 RB Rail AS
CRM & Procurement Mgmnt system A combined CRM, Procurement Management and Supplier relationship/procurement related Communications flow system (software solution) allowing for supplier relationship management and information storage, procurement process management and contract information storage, etc. Good/Services Q2 RB Rail AS
Design review and design assessment services in Estonia (Tallinn – EE/LV border) Design works review and assessment services. According to the Construction Law of Estonia the design must be expertised to conform with national legislation. Furthermore the design will be reviewed to fully conform Rail Baltica Design Guidelines and Operational Plan. The services will be requested for an extended scope of review and at an early design stage. Please note that whilst the strategy detail is currently being assessed and determined, then as a minimum it is planned to have at least one contract per country. Paslaugos Q2 RB Rail AS
Design review and design assessment services in Lithuania (LT/LV border – Kaunas (Palemonas)) Design works review and assessment services. According to the Construction Law of Lithuania the design must be expertised to conform with national legislation. Furthermore the design will be reviewed to fully conform Rail Baltica Design Guidelines and Operational Plan. The services will be requested for an extended scope of review and at an early design stage. Please note that whilst the strategy detail is currently being assessed and determined, then as a minimum it is planned to have at least one contract per country. Paslaugos Q2 RB Rail AS
DTD for section from Misa to LV/LT border Design and design supervision services for the construction of the new line from Misa to the Latvian/Lithuanian border Paslaugos Q2 RB Rail AS
DTD for section from Vangaži to LV/EE border Design and design supervision services for the construction of the new line from Vangaži to the Latvian/Estonian border Paslaugos Q2 RB Rail AS
Expert Services Framework Procurement of framework agreements undertaken in lots under one procurement procedure, for expert services in multiple service categories. Paslaugos Q2 RB Rail AS
MIN MAT study II stage expertise for proposed solutions Expert opinion from third party for MINMAT study II phase deliverables (proposed technical solutions) Paslaugos Q2 RB Rail AS
NoBo assessment for Rail Baltica in Estonia, Latvia and Lithuania Conformity assessment of railway subsystems by NoBo in accordance with the Directive 2008/57/EC and the new Directive 2016/797/EU to ensure railway interoperability. The assessment will start with design phase and will be phased in accordance to Rail Baltica delivery. The assessment will include issuance of Intermediate State of Verification and EC certification. Please note that whilst the strategy detail is currently being assessed and determined, one likely scenario is to have one contract for the entire technical (INF TSI, PRM TSI, ENE TSI, CCS TSI, SRT TSI) and geographical scope (EE, LV, LT) Paslaugos Q2 RB Rail AS
Procurement Support Services Framework Support services framework for a minimum of 2 years to allow additional procurement resource deployment for short to medium term assignments. Anticipated to involve various junior and specialist levels to cover a range of requirements associated with procurement tasks. Paslaugos Q2 RB Rail AS
Riga Node Operational Study Study about 1435/1520 intermodality for passenger services in Riga node, optimising the infrastructures of both gauge in a long term perspective, taking into account the needs of all railways operators. Paslaugos Q2 RB Rail AS
Study on Procurement Law & Systems advantages in the Baltic States RB Rail AS as a project coordinator requires an in depth overview of the similarities, differences and limitations of the national procurement laws in force in the three Baltic states as well as the procurement systems implemented for undertaking procurement exercises involving public funds. Paslaugos Q2 RB Rail AS
Translation services Translation services for RB Rail AS Paslaugos Q2 RB Rail AS
Design review and design assessment services in Latvia (EE/LV border – LV/LT border) Design works review and assessment services. According to the Construction Law of Latvia the design must be expertised to conform with national legislation. Furthermore the design will be reviewed to fully conform Rail Baltica Design Guidelines and Operational Plan. The services will be requested for an extended scope of review and at an early design stage. Please note that whilst the strategy detail is currently being assessed and determined, then as a minimum it is planned to have at least one contract per country. Paslaugos Q2-Q3 RB Rail AS
GIS software solution (depends on CEF1 amendment approval) GIS sofware solution will be bases for our design data management Good/Services Q2-Q3 RB Rail AS
Rail Baltica Digitalisation and Innovation Strategy Rail Baltica Global Project is seeking to develop a comprehensive Innovation strategy, including digitalisation, based on industry best practice in both rail and other sectors. This Procurement is to help establish such programmes, together with some of the practical aspects of commercialisation, and requires both research and the synthesis of findings into appropriate, structured guidelines to be used both for the delivery as well as future operational phases of the Rail Baltica project.    The use of innovative technologies and techniques is one of the key methods for delivering the most efficient, cost-effective and modern railway infrastructure and associated services, for driving traffic flows and maximizing Gross Value Added in a sustainable way. Paslaugos Q2-Q3 RB Rail AS
Scheduling software solution (depends on CEF1 amendment approval) This will be moved and implemented together with Risk Management system Good/Services Q2-Q3 RB Rail AS
AIM study The study will describe what will be the best Asset Information Management system for Rail Baltica and how to integrate it with BIM system Paslaugos Q3 RB Rail AS
Unified geodetic grid justification for Rail Baltica line – expert study The study shall describe the possible requirements for unified geodetic grid for all three Baltic Countries and desicribe further steps how it shall be implemented. Paslaugos Q2-Q3 RB Rail AS
Rail Baltica Global Project Marketing Strategy The strategy shall draw on the relevant industry best practices to lay the foundations for a long-term marketing approach for the Rail Baltica Global Project. The strategy shall aim to develop key narratives and practical action plans, inter alia, in such areas as brand development and awareness, route promotion, marketing partnerships, early product development and prototyping for freight and passenger mobility, client attraction and engagement, early customer orientation, gauging of future customer expectations, market readiness promotion, pricing considerations, market targeting and competitive landscape assessment, value proposition formulation and development, etc. The strategy is part of the Rail Baltica Commercialization Plan activities. Paslaugos Q3 RB Rail AS
Safety assessment study for Rail Baltica hydrotechnical structures Overview of most important hydrotechnical structures on the Rail Baltica main line. Character of location, possible damages and collapse risks based on the existing hydrotechnical situation. Paslaugos Q3 RB Rail AS
Shadow operator services Shadow operator is an entity which prefigures future freight and passengers operators. He supports railway start-ups with operations-related expertise and know-how, considering the needs of operations and maintenance from the early design stage. Paslaugos Q3 RB Rail AS
Spatial and technical analysis of the co-effect for an additional freight station / dry port terminal and buffer station in Tallinn area TBC Paslaugos Q3-Q4 RB Rail AS
HR Services TBC Paslaugos Q4 RB Rail AS
Rail Baltica reliability, availability and maintainability and safety study Railway systems are combinations of software, electronics and mechanical components and the interactions between technical systems and the economical / social systems are inter-dependent. This study aims to provide knowledge and skills to enable designers/infrastructure managers in the development and operation of safe, reliable and easily maintainable systems. The result of study prescribes how products and systems can be used safely, and how technical faults can be avoided and how to plan and cost-effectively perform maintenance Paslaugos Q4 RB Rail AS
Service of technical supervision of DTD BIM deliverables Additional expertise for DTD  BIM deliverables  to secure correct data management inside of BIM system Paslaugos Q4 RB Rail AS
Study for location with interaction with 1520 mm gauge network (Kaunas Node) Study on integration possibilities of the existing 1520 mm infrastructure with the recommended generic ERTMS solution, in Kaunas, Vilnius and Muuga areas. Paslaugos Q4 RB Rail AS
BIM and other Data Security guidelines TBC Paslaugos TBC RB Rail AS
Company Secretary TBC Paslaugos TBC RB Rail AS
Hydrogeological Risk Assessment TBC Requirement being assessed. Paslaugos TBC RB Rail AS
Study of Sustainable solution implementation for Rail Baltica railway line TBC Good/Services TBC RB Rail AS