Rail Baltica
3b32dc00c7bdeef79441a5117d9c789dc7a26916

„RB Rail“ vykdomi konkursai

Šiame skyriuje pateikiama informacija apie „RB Rail“ vykdomus viešuosius pirkimus. Išsamesnės informacijos apie nacionalinių įgyvendinančiųjų institucijų vykdomus aktyvius viešuosius pirkimus rasite atitinkamos nacionalinės perkančiosios organizacijos interneto svetainėje. Informaciją apie užbaigtus „RB Rail“ konkursus galite rasti archyve.

Archyvas

„RB Rail“, AS

Pirkimo ID Nr. Pavadinimas Paskelbta Atnaujinta Pateikimo data
RBR 2025/16

Directors and Officers Liability Insurance

23.12.2025 03.02.2026 23.02.2026
RBR 2025/12

Legal services

01.11.2025 19.11.2025 28.11.2025
RBR 2025/8

Establishment of Rail Baltica Primary CP0 Geodetic Benchmarks in Estonia, Latvia and Lithuania

15.10.2025 15.10.2025 31.10.2025

Pirkimų reglamentas ir tiekėjo kvalifikacija

RBR 2025/1

Aerodynamic impact assessment

14.07.2025 20.10.2025
RBR 2025/1

Rail Baltica announced a market consultation for aerodynamic impact assessment procurement

07.04.2025 24.04.2025
RBR 2022/26

Rail Baltica Control-Command and Signalling Subsystem Design and Build

28.12.2022 29.03.2023 29.03.2023
RBR 2022/25

Design and design supervision services for the construction of the new railway line through Kaunas Urban Node

24.11.2022 16.01.2023
RBR 2022/14

Competitive procedure with negotiations “Consolidated supply of railway ballast for Rail Baltica railway construction”

14.07.2022 06.09.2022 16.09.2022
RBR 2022/11

Design and design supervision services for the construction of the new line from  Kaunas Urban Node to Polish State Border

02.06.2022 01.08.2022
RBR 2021/15

Competitive procedure with negotiations “Consolidated supply of rails for Rail Baltica railway construction”

09.08.2021 12.12.2024 18.10.2021
RBR 2021/2

Competitive procedure with negotiations „Consolidated supply of turnouts and rail expansion joints for Rail Baltica railway construction”

11.06.2021 30.09.2021 30.09.2021
RBR 2021/13

Consolidated supply of track sleepers with rail fastenings and under sleeper pads for construction of Rail Baltica railway line

09.06.2021 12.12.2024 10.01.2022
RBR 2021/1

Consolidated supply of multi-ducts, cable ducts, manholes and cable channels for construction of Rail Baltica railway line

28.04.2021 12.12.2024 14.06.2021
15260

Projekto „Rail Baltica“ geležinkelio linijos ruože Kaunas-Panevėžys-LT/LV rangos darbai (I etapas): viršutinės kelio konstrukcijos įrengimas (ruože 0+500 km iki 58+400 km)

26.06.2020 26.07.2020
„RB Rail“ konkursų archyvas