Soovituslik alguskuupäev
Hankija
Seis
Hanke nimi (EN) Hanke eseme lühikirjeldus (EN) Kategooria Soovituslik alguskuupäev Hankija Seis
Audit services 2019-2021 TBC Teenus Q1 RB Rail AS Announced in January
Construction and constructions logistics supply study for Rail Baltica TBC Teenus Q1 RB Rail AS
Directors & Officers liability Insurance TBC Teenus Q1 RB Rail AS
Employees Health Insurance TBC Teenus Q1 RB Rail AS
Global Forum Organisation services for the Rail Baltica Global Forum in Vilnius, Lithuania Teenus Q1 RB Rail AS Announced in January
Local construction & construction supply logistics studies in LV and LT and pan-baltic study This styudy shall analyze construction tender options, type of contracts, market players availabilities, risks related to split of construction volumes and construction time Teenus Q1 RB Rail AS
Procurement Support Services Framework Support services framework for a minimum of 2 years to allow additional procurement resource deployment for short to medium term assignments. Anticipated to involve various junior and specialist levels to cover a range of requirements associated with procurement tasks. Teenus Q1 RB Rail AS
Rail Baltica Digitalisation and Innovation Strategy Rail Baltica Global Project is seeking to develop a comprehensive Innovation strategy, including digitalisation, based on industry best practice in both rail and other sectors. This Procurement is to help establish such programmes, together with some of the practical aspects of commercialisation, and requires both research and the synthesis of findings into appropriate, structured guidelines to be used both for the delivery as well as future operational phases of the Rail Baltica project.    The use of innovative technologies and techniques is one of the key methods for delivering the most efficient, cost-effective and modern railway infrastructure and associated services, for driving traffic flows and maximizing Gross Value Added in a sustainable way. Teenus Q1 RB Rail AS
Risk Management system and Project Scheduling software solution Common IT platform/system to be used for Project planning and Risk Management needs. Project management solution will provide businesses functionalities for project planning, scheduling and risk management. The tool will secure detailed reporting and project control opportunities including but not limited with earned value management, Critical Path Method analysis,  “what-if” and/or other detailed analysis as well as ability to compare multiple plan versions revised schedules etc. Risk module integrated with project planning tool will provide possibilities to run detailed quantitative risk analysis for both schedule risk and cost risk for each project step and/or project in general. Good/Services Q1 RB Rail AS
Scheduling software solution This will be moved and implemented together with Risk Management system Q1 RB Rail AS
Study on the maximization of Gross Value Added (GVA) of Rail Baltica international passenger stations The study shall benchmark, analyze and provide policy recommendations towards the promotion and maximization of Gross Value Added (GVA) of the Rail Baltica 7 international passenger stations. The study shall extensively draw on European and global best practices, as well as emerging opportunities stemming from digitalization. The study shall cover the infrastructural, commercial, as well as socio-economic (including catalytic) aspects of GVA promotion. The study is part of the Rail Baltica Commercialization Plan activities. Teenus Q1 RB Rail AS
Travel Agency services for business trips TBC Teenus Q1 RB Rail AS
Expert Services Framework TBC Teenus Q1-2 RB Rail AS
Unified geodetic grid justification for Rail Baltica line – exoert study The study shall describe the possible requirements for unified geodetic grid for all three Baltic Countries and desicribe further steps how it shall be implemented. Teenus Q1-2 RB Rail AS
CRM & Procurement Mgmnt system A combined CRM, Procurement Management and Supplier relationship/procurement related Communications flow system (software solution) allowing for supplier relationship management and information storage, procurement process management and contract information storage, etc. Good/Services Q1-Q2 RB Rail AS
Translation services TBC Teenus Q1-Q2 RB Rail AS
Control, command and signaling (including ERTMS) subsystem procurement and deployment strategy for Rail Baltica The aim of this study is to produce a comprehensive procurement and deployment strategy for Control, command and signaling subsystems (including ERTMS and passenger information systems, bearing in mind that parties to the 30.09.2016 Rail Baltic / Rail Baltica Contracting Scheme Agreement have agreed that the acquisition and deployment of these systems shall be organized by RB Rail using the consolidated procurement procedure. The strategy shall be based on a thorough market and supplier assessment, with a particular emphasis on ensuring optimum interoperability by deploying a single solution along the entire railway line in excess of 700 km, covering all three Baltic countries along the TEN-T North Sea - Baltic Core Network Corridor alignment and having a dynamic deployment schedule. The study shall include, inter alia, supplier market analysis, technical pre-study, procurement and deployment strategy development Teenus Q2 RB Rail AS
DTD for section from Misa to LV/LT border TBC Teenus Q2 RB Rail AS
DTD for section from Vangaži to LV/EE border TBC Teenus Q2 RB Rail AS
GIS software solution GIS sofware solution will be bases for our design data management Teenus Q2 RB Rail AS
MIN MAT study II stage expertise for proposed solutions Expert opinion from third party for MINMAT study II phase deliverables (proposed technical solutions) Teenus Q2 RB Rail AS
Study on Procurement Law & Systems advantages in the Baltic States RB Rail AS as a project coordinator requires an in depth overview of the similarities, differences and limitations of the national procurement laws in force in the three Baltic states as well as the procurement systems implemented for undertaking procurement exercises involving public funds. Teenus Q2 RB Rail AS
NoBo technical assesment of the technical designs in Lithuania, Latvia and Estonia The assessment of conformity of subsystems and interoperability constituents is necessary in accordance Directive 2008/57/EC and the new Directive 2016/797/EU. The conformity assessment procedure is required to ensure interoperability between the Global project and the European railway network. The assessment is carried out by an independent body/bodies with required competence. Assessment of conformity will start with detailed technical design and ends with formal certification of each seperate completed railway subsystem by the Notified Body (NoBo Teenus Q2-Q3 RB Rail AS
Technical assessment of the technical design (Central section in Latvia railway line) for Rail Baltica (Misa river – Riga – Upeslejas) TBC Teenus Q2-Q3 RB Rail AS
Technical assessment of the technical design (Central section in Latvia railway line) for Rail Baltica Upeslejas through Riga – Misa river + Vangaži through Salaspils – Misa river Procurement for an independent body that will assess the compliance of the technical design to the predefined parameters. According to the Latvian Construction Law the technical design must be prepared by a competent specialist specified in the Construction law or assessed by a competent specialist. Completion of the technical expert assessment is a prerequisite for preparation of procurement documents and for construction works Teenus Q2-Q3 RB Rail AS
Technical assessment of the technical design (Vangaži-Misa section)  for Rail Baltica TBC Teenus Q2-Q3 RB Rail AS
Technical assessment of the technical design in Estonia (Rapla-Parnu section) Procurement for an independent body that will assess the compliance of the technical design to the predefined parameters. According to the Estonian Construction Law the design must fully conform to Technical Specifications for Interoperability. It is envisaged to conform simultaneously to both national and EU requirements. Completion of the technical expert assessment is a prerequisite for preparation of procurement documents and for construction works Teenus Q2-Q3 RB Rail AS
Technical assessment of the technical design in Estonia (Tallinn-Rapla section) Procurement for an independent body that will assess the compliance of the technical design to the predefined parameters. According to the Estonian Construction Law the design must fully conform to Technical Specifications for Interoperability. It is envisaged to conform simultaneously to both national and EU requirements. Completion of the technical expert assessment is a prerequisite for preparation of procurement documents and for construction works Teenus Q2-Q3 RB Rail AS
Technical assessment of the technical design in Estonia Parnu-EE/LV border section) Procurement for an independent body that will assess the compliance of the technical design to the predefined parameters. According to the Estonian Construction Law the design must fully conform to Technical Specifications for Interoperability. It is envisaged to conform simultaneously to both national and EU requirements. Completion of the technical expert assessment is a prerequisite for preparation of procurement documents and for construction works Teenus Q2-Q3 RB Rail AS
Technical assessment of the technical design in Lithuania (Kaunas-Ramygala) Procurement for an independent body that will assess the compliance of the technical design to the predefined parameters. According to the Construction Law of Lithuania the design must be expertised to conform with national legislation. Furthermore the design must be fully conform to Technical Specifications for Interoperability. It is envisaged to conform simultaneously to both national and EU requirements. Completion of the technical expert assessment is a prerequisite for preparation of procurement documents and for construction works Teenus Q2-Q3 RB Rail AS
Technical assessment of the technical design in Lithuania (Ramygala -LT/LV border) Procurement for an independent body that will assess the compliance of the technical design to the predefined parameters. According to the Construction Law of Lithuania the design must be expertised to conform with national legislation. Furthermore the design must be fully conform to Technical Specifications for Interoperability. It is envisaged to conform simultaneously to both national and EU requirements. Completion of the technical expert assessment is a prerequisite for preparation of procurement documents and for construction works Teenus Q2-Q3 RB Rail AS
AIM study The study will describe what will be the best Asset Information Management system for Rail Baltica and how to integrate it with BIM system Teenus Q3 RB Rail AS
Rail Baltica Global Project Marketing Strategy The strategy shall draw on the relevant industry best practices to lay the foundations for a long-term marketing approach for the Rail Baltica Global Project. The strategy shall aim to develop key narratives and practical action plans, inter alia, in such areas as brand development and awareness, route promotion, marketing partnerships, early product development and prototyping for freight and passenger mobility, client attraction and engagement, early customer orientation, gauging of future customer expectations, market readiness promotion, pricing considerations, market targeting and competitive landscape assessment, value proposition formulation and development, etc. The strategy is part of the Rail Baltica Commercialization Plan activities. Teenus Q3 RB Rail AS
Kinetic Energy recovery systems for Rail Baltica Railway Infrastructure K. Sirk. It is reasonable to consider as separate chapter for zero emission strategy. Teenus Q3-Q4 RB Rail AS
HR Services TBC Teenus Q4 RB Rail AS Announced in January
Rail Baltica reliability, availability and maintainability and safety study Railway systems are combinations of software, electronics and mechanical components and the interactions between technical systems and the economical / social systems are inter-dependent. This study aims to provide knowledge and skills to enable designers/infrastructure managers in the development and operation of safe, reliable and easily maintainable systems. The result of study prescribes how products and systems can be used safely, and how technical faults can be avoided and how to plan and cost-effectively perform maintenance Teenus Q4 RB Rail AS
Service of technical supervision of DTD BIM deliverables Additional expertise for DTD  BIM deliverables  to secure correct data management inside of BIM system Teenus Q4 RB Rail AS
BIM and other Data Security guidelines TBC Teenus TBC RB Rail AS
Company Secretary TBC Teenus TBC RB Rail AS
IT services TBC Teenus TBC RB Rail AS
Neris River environmental study Additional study related to Natura 2000 in Neris river valley Teenus TBC RB Rail AS
Shadow operator services TBC Teenus TBC RB Rail AS
Spatial and technical analysis of the co-effect for an additional freight station / dry port terminal and buffer station in Tallinn area RBE is  dealing with it. It shall be finally agreed between 2 management Teenus TBC RB Rail AS
Study of Sustainable solution implementation for Rail Baltica railway line TBC TBC RB Rail AS