{"id":15280,"date":"2025-04-03T12:13:43","date_gmt":"2025-04-03T12:13:43","guid":{"rendered":"https:\/\/www.railbaltica.org\/news\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/"},"modified":"2025-08-21T15:44:51","modified_gmt":"2025-08-21T15:44:51","slug":"norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu","status":"publish","type":"news","link":"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/","title":{"rendered":"Norisin\u0101s sarunas ar pretendentiem par Rail Baltica dzelzce\u013ca signaliz\u0101cijas sist\u0113mas projekt\u0113\u0161anu un b\u016bvniec\u012bbu"},"content":{"rendered":"<section\n    class=\"align wp-block-hero-page-block relative flex overflow-hidden z-10 mt-20 md:mt-52\"\n>\n            <div\n            class=\"container md:!px-14\"\n        >\n            <div\n                class=\"bg-dark text-white rounded p-4 md:p-10\"\n            >\n                                <div\n    class=\"flex justify-between border-t pt-2.5 my-5 text-sm\"\n>\n    <span>Dalies ar jaunumiem\n<\/span>\n    <ul\n        class=\"flex items-center gap-5\"\n    >\n        <li>\n            <a\n                href=\"https:\/\/www.facebook.com\/sharer\/sharer.php?u=https%3A%2F%2Fwww.railbaltica.org%2Flv%2Fjaunumi%2Fnorisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu%2F\"\n                target=\"_blank\"\n                rel=\"noopener noreferrer\"\n                aria-label=\"Share on Facebook\"\n                class=\"transition-opacity hover:opacity-75\"\n            >\n                <svg\n                    width=\"20\"\n                    height=\"20\"\n                    viewBox=\"0 0 20 20\"\n                    fill=\"none\"\n                    xmlns=\"http:\/\/www.w3.org\/2000\/svg\"\n                >\n                    <path\n                        d=\"M7.5 6.66667H5V10H7.5V20H11.6667V10H14.7017L15 6.66667H11.6667V5.2775C11.6667 4.48167 11.8267 4.16667 12.5958 4.16667H15V0H11.8267C8.83 0 7.5 1.31917 7.5 3.84583V6.66667Z\"\n                        fill=\"white\"\n                    \/>\n                <\/svg>\n            <\/a>\n        <\/li>\n        <li>\n            <a\n                href=\"https:\/\/twitter.com\/intent\/tweet?url=https%3A%2F%2Fwww.railbaltica.org%2Flv%2Fjaunumi%2Fnorisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu%2F&amp;text=Norisin%C4%81s+sarunas+ar+pretendentiem+par+Rail+Baltica+dzelzce%C4%BCa+signaliz%C4%81cijas+sist%C4%93mas+projekt%C4%93%C5%A1anu+un+b%C5%ABvniec%C4%ABbu\"\n                target=\"_blank\"\n                rel=\"noopener noreferrer\"\n                aria-label=\"Share on Twitter\"\n                class=\"transition-opacity hover:opacity-75\"\n            >\n                <svg\n                    width=\"20\"\n                    height=\"20\"\n                    viewBox=\"0 0 20 20\"\n                    fill=\"none\"\n                    xmlns=\"http:\/\/www.w3.org\/2000\/svg\"\n                >\n                    <path\n                        d=\"M14.7313 2.68748H17.238L11.763 8.88248L18.2038 17.3125H13.1597L9.20966 12.2L4.68966 17.3125H2.18299L8.03883 10.6866L1.86133 2.68665H7.03216L10.603 7.35998L14.7322 2.68665L14.7313 2.68748ZM13.8522 15.8275H15.2405L6.27716 4.09415H4.78716L13.8522 15.8275Z\"\n                        fill=\"white\"\n                    \/>\n                <\/svg>\n            <\/a>\n        <\/li>\n        <li>\n            <a\n                href=\"https:\/\/www.linkedin.com\/sharing\/share-offsite\/?url=https%3A%2F%2Fwww.railbaltica.org%2Flv%2Fjaunumi%2Fnorisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu%2F\"\n                target=\"_blank\"\n                rel=\"noopener noreferrer\"\n                aria-label=\"Share on LinkedIn\"\n                class=\"transition-opacity hover:opacity-75\"\n            >\n                <svg\n                    width=\"20\"\n                    height=\"20\"\n                    viewBox=\"0 0 20 20\"\n                    fill=\"none\"\n                    xmlns=\"http:\/\/www.w3.org\/2000\/svg\"\n                >\n                    <path\n                        d=\"M18.4097 0.000139829H1.46998C1.27956 -0.00250476 1.09049 0.0323869 0.913553 0.102822C0.73662 0.173257 0.575295 0.277857 0.438791 0.410646C0.302287 0.543436 0.193279 0.701814 0.11799 0.876737C0.0427018 1.05166 0.00260836 1.2397 0 1.43012V18.5699C0.00260836 18.7603 0.0427018 18.9483 0.11799 19.1233C0.193279 19.2982 0.302287 19.4566 0.438791 19.5894C0.575295 19.7221 0.73662 19.8267 0.913553 19.8972C1.09049 19.9676 1.27956 20.0025 1.46998 19.9999H18.4097C18.6002 20.0025 18.7892 19.9676 18.9662 19.8972C19.1431 19.8267 19.3044 19.7221 19.4409 19.5894C19.5774 19.4566 19.6864 19.2982 19.7617 19.1233C19.837 18.9483 19.8771 18.7603 19.8797 18.5699V1.43012C19.8771 1.2397 19.837 1.05166 19.7617 0.876737C19.6864 0.701814 19.5774 0.543436 19.4409 0.410646C19.3044 0.277857 19.1431 0.173257 18.9662 0.102822C18.7892 0.0323869 18.6002 -0.00250476 18.4097 0.000139829ZM6.02992 16.7399H3.02996V7.74003H6.02992V16.7399ZM4.52994 6.48005C4.1162 6.48005 3.71942 6.31569 3.42687 6.02314C3.13431 5.73059 2.96996 5.3338 2.96996 4.92007C2.96996 4.50634 3.13431 4.10955 3.42687 3.817C3.71942 3.52445 4.1162 3.36009 4.52994 3.36009C4.74963 3.33518 4.97211 3.35695 5.1828 3.42398C5.3935 3.491 5.58766 3.60178 5.75258 3.74905C5.91749 3.89632 6.04944 4.07676 6.13979 4.27856C6.23013 4.48036 6.27683 4.69897 6.27683 4.92007C6.27683 5.14117 6.23013 5.35978 6.13979 5.56158C6.04944 5.76338 5.91749 5.94382 5.75258 6.09109C5.58766 6.23836 5.3935 6.34914 5.1828 6.41617C4.97211 6.48319 4.74963 6.50496 4.52994 6.48005ZM16.8498 16.7399H13.8498V11.91C13.8498 10.7 13.4198 9.91 12.3298 9.91C11.9925 9.91247 11.664 10.0183 11.3887 10.2132C11.1133 10.4081 10.9043 10.6827 10.7899 11C10.7116 11.235 10.6777 11.4826 10.6899 11.73V16.7299H7.68989V7.73003H10.6899V9.00001C10.9624 8.52713 11.3587 8.13755 11.8363 7.87323C12.3138 7.60892 12.8544 7.47989 13.3998 7.50003C15.3998 7.50003 16.8498 8.79002 16.8498 11.56V16.7399Z\"\n                        fill=\"white\"\n                    \/>\n                <\/svg>\n            <\/a>\n        <\/li>\n        <li>\n            <button\n                type=\"button\"\n                class=\"copy-url-btn relative my-auto flex transition-opacity hover:opacity-75\"\n                data-url=\"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/\"\n            >\n                <svg\n                    width=\"21\"\n                    height=\"21\"\n                    viewBox=\"0 0 21 21\"\n                    fill=\"none\"\n                    xmlns=\"http:\/\/www.w3.org\/2000\/svg\"\n                >\n                    <path\n                        d=\"M10.5205 20C15.7661 20 20 15.7455 20 10.4795C20 5.23392 15.7661 1 10.5205 1M10.5205 20C5.25446 20 1 15.7455 1 10.4795C1 5.23392 5.25446 1 10.5205 1M10.5205 20V1M18.7429 5.75H2.26324M18.7958 15.1345H2.21035M1.05135 10.5H19.9486M10.5103 20C13.1333 20 15.25 15.7455 15.25 10.4795C15.25 5.23392 13.1333 1 10.5103 1C7.87697 1 5.75 5.23392 5.75 10.4795C5.75 15.7455 7.87697 20 10.5103 20Z\"\n                        stroke=\"white\"\n                        stroke-linecap=\"round\"\n                        stroke-linejoin=\"round\"\n                    \/>\n                <\/svg>\n                <span\n                    class=\"absolute hidden translate-x-[-10px] translate-y-[30px]\"\n                >Copied!<\/span>\n            <\/button>\n        <\/li>\n    <\/ul>\n<\/div>\n\n                                    <time\n                        datetime=\"\"\n                        class=\"mb-2.5 flex text-xl text-blue\"\n                    >\n                        03.04.2025\n                    <\/time>\n                \n                                    <h1 class='h1 max-w-198'>\n            RB Rail AS negotiations with tenderers for the design and construction of the Rail Baltica railway signalling system\n        <\/h1>\n                \n                            <\/div>\n        <\/div>\n    <\/section>\n<section\n    class=\"overflow-hidden py-5 md:pt-10 md:pb-5 align wp-block-excerpt-block\"\n>\n    <div\n        class=\"container relative flex flex-col items-start z-10 md:text-xl lg:!px-4\"\n    >\n                    <div\n                class=\"textual w-full text-dark text-xl lg:px-12 md:mx-auto md:max-w-222 md:text-xl\"\n            >\n                RB Rail AS ir ofici\u0101li uzs\u0101cis m\u0113nesi ilgu sarunu posmu ar visiem pretendentiem, kuri ir iesniegu\u0161i s\u0101kotn\u0113jos pied\u0101v\u0101jumus Rail Baltica vad\u012bbas, kontroles un signaliz\u0101cijas apak\u0161sist\u0113mas projekt\u0113\u0161anas un b\u016bvniec\u012bbas (D&#038;B) iepirkum\u0101.\n            <\/div>\n            <\/div>\n<\/section>\n<section\n    class=\"py-5 md:py-10 align wp-block-textual-block\"\n>\n    <div\n        class=\"container\"\n    >\n        <div\n            class=\"textual w-full text-xl text-dark break-words [&#038;_span]:!text-dark [&#038;_a]:!text-dark\"\n        >\n                            <p><strong>RB Rail AS has officially started a one-month negotiation phase with all tenderers that have been invited to submit initial bids in the Design and Build (D&amp;B) tender for the Rail Baltica Control-Command and Signalling (CCS) subsystem.<\/strong><\/p>\n<p>The purpose of these negotiations is to further develop and improve the technical and financial proposals submitted by the tenderers. The goal is to find the best possible solution \u2013 both technically and financially \u2013 that meets the project\u2019s requirements and fits within the Contracting Authority\u2019s budget.<\/p>\n<p>Following international candidates have successfully qualified and submitted their initial bids for their participation in the negotiation phase:<\/p>\n<ul>\n<li><strong>GTS Deutschland GmbH<\/strong> (Germany)<strong> Hitachi Rail STS S.P.A.<\/strong> (Italy)*<\/li>\n<li>A consortium of <strong>Indra Sistemas, S.A.<\/strong> and <strong>A\u017dD Praha S.R.O.<\/strong> (Spain and Czech Republic)<\/li>\n<li>A consortium named <strong>\u201cSKGN Baltics\u201d<\/strong>, including <strong>Siemens Mobility OY Latvian Branch<\/strong>, <strong>Siemens Mobility GMBH<\/strong>, <strong>GRK Suomi OY<\/strong>, <strong>NRC Group Finland OY<\/strong>, and <strong>Kontron Transportation GMBH<\/strong> (Latvia, Germany, Finland, Austria)<\/li>\n<li>A consortium named <strong>\u201cALSTOM \u2013 COBRA \u2013 FIMA\u201d<\/strong>, made up of <strong>Alstom Transport SA<\/strong>, <strong>Alstom Baltics SIA<\/strong>, <strong>Cobra Instalaciones y Servicios S.A.<\/strong>, and <strong>PS \u201cFima KZA Krakow\u201d<\/strong> (France, Latvia, Spain)<\/li>\n<\/ul>\n<p>The contract with the selected supplier is expected to be signed by end of 2025.<\/p>\n<p>\u201cGiven the scale of this procurement, the commission has invested significant time to ensure that all requirements and criteria are clearly defined and well understood. The CCS subsystem is a critical component of the railway infrastructure \u2013 it is essential for ensuring safe operations, smooth cross-border train movement, and efficient traffic management across the Rail Baltica network,\u201d said <strong>Aiga Benfelde<\/strong>, Acting Head of Procurement at RB Rail AS and Chairperson of the Procurement Commission.<\/p>\n<p>She added, \u201cThe CCS design builds on established European signalling system ERTMS, on some initiatives such as Shift2Rail and incorporates proven technical solutions like EULYNX. These elements contribute to a harmonized and future-proof signalling system that meets the latest EU standards. The system architecture also includes a flexible Traffic Management System, energy-efficient power supply, and modern cableway infrastructure. In addition, strong safety and cybersecurity frameworks are being integrated from the start to meet the requirements of a high-speed, cross-border railway.\u201d<\/p>\n<p><em>After the acquisition, the company is now represented by Hitachi GTS Deutschland GmbH, as GTS Deutschland GmbH has been integrated into the Hitachi Group.<\/em><\/p>\n\n                    <\/div>\n    <\/div>\n<\/section>\n<section\n    class=\"overflow-hidden py-5 md:pt-5 md:pb-10 align wp-block-button-cta-block !pt-[0]\"\n>\n    <div\n        class=\"container w-full relative flex flex-col items-start z-10\"\n    >\n        <div\n            class=\"w-full border-t border-dark pt-5 mt-4 md:mt-5 md:pt-10\"\n        >\n        <\/div>\n\n                    <a\n        href=\"\/news\/\"\n                class=\"btn-outline-dark mx-auto\"\n    >\n        \n        Return to all news\n        \n        \n    <\/a>\n            <\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"<p>RB Rail AS ir ofici\u0101li uzs\u0101cis m\u0113nesi ilgu sarunu posmu ar visiem pretendentiem, kuri ir iesniegu\u0161i s\u0101kotn\u0113jos pied\u0101v\u0101jumus Rail Baltica vad\u012bbas, kontroles un signaliz\u0101cijas apak\u0161sist\u0113mas projekt\u0113\u0161anas un b\u016bvniec\u012bbas (D&#038;B) iepirkum\u0101.<\/p>\n","protected":false},"featured_media":15117,"template":"","news_category":[],"class_list":["post-15280","news","type-news","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Norisin\u0101s sarunas ar pretendentiem par Rail Baltica dzelzce\u013ca signaliz\u0101cijas sist\u0113mas projekt\u0113\u0161anu un b\u016bvniec\u012bbu - RB<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/\" \/>\n<meta property=\"og:locale\" content=\"lv_LV\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Norisin\u0101s sarunas ar pretendentiem par Rail Baltica dzelzce\u013ca signaliz\u0101cijas sist\u0113mas projekt\u0113\u0161anu un b\u016bvniec\u012bbu - RB\" \/>\n<meta property=\"og:description\" content=\"RB Rail AS ir ofici\u0101li uzs\u0101cis m\u0113nesi ilgu sarunu posmu ar visiem pretendentiem, kuri ir iesniegu\u0161i s\u0101kotn\u0113jos pied\u0101v\u0101jumus Rail Baltica vad\u012bbas, kontroles un signaliz\u0101cijas apak\u0161sist\u0113mas projekt\u0113\u0161anas un b\u016bvniec\u012bbas (D&amp;B) iepirkum\u0101.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/\" \/>\n<meta property=\"og:site_name\" content=\"RB\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-21T15:44:51+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.railbaltica.org\/wp-content\/uploads\/2025\/07\/Rail-Baltica-visualisation-11.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1152\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.railbaltica.org\\\/lv\\\/jaunumi\\\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\\\/\",\"url\":\"https:\\\/\\\/www.railbaltica.org\\\/lv\\\/jaunumi\\\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\\\/\",\"name\":\"Norisin\u0101s sarunas ar pretendentiem par Rail Baltica dzelzce\u013ca signaliz\u0101cijas sist\u0113mas projekt\u0113\u0161anu un b\u016bvniec\u012bbu - RB\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.railbaltica.org\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.railbaltica.org\\\/lv\\\/jaunumi\\\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.railbaltica.org\\\/lv\\\/jaunumi\\\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.railbaltica.org\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Rail-Baltica-visualisation-11.jpg\",\"datePublished\":\"2025-04-03T12:13:43+00:00\",\"dateModified\":\"2025-08-21T15:44:51+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.railbaltica.org\\\/lv\\\/jaunumi\\\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\\\/#breadcrumb\"},\"inLanguage\":\"lv-LV\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.railbaltica.org\\\/lv\\\/jaunumi\\\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"lv-LV\",\"@id\":\"https:\\\/\\\/www.railbaltica.org\\\/lv\\\/jaunumi\\\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.railbaltica.org\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Rail-Baltica-visualisation-11.jpg\",\"contentUrl\":\"https:\\\/\\\/www.railbaltica.org\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/Rail-Baltica-visualisation-11.jpg\",\"width\":2048,\"height\":1152},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.railbaltica.org\\\/lv\\\/jaunumi\\\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.railbaltica.org\\\/lv\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Norisin\u0101s sarunas ar pretendentiem par Rail Baltica dzelzce\u013ca signaliz\u0101cijas sist\u0113mas projekt\u0113\u0161anu un b\u016bvniec\u012bbu\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.railbaltica.org\\\/#website\",\"url\":\"https:\\\/\\\/www.railbaltica.org\\\/\",\"name\":\"RB\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.railbaltica.org\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"lv-LV\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Norisin\u0101s sarunas ar pretendentiem par Rail Baltica dzelzce\u013ca signaliz\u0101cijas sist\u0113mas projekt\u0113\u0161anu un b\u016bvniec\u012bbu - RB","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/","og_locale":"lv_LV","og_type":"article","og_title":"Norisin\u0101s sarunas ar pretendentiem par Rail Baltica dzelzce\u013ca signaliz\u0101cijas sist\u0113mas projekt\u0113\u0161anu un b\u016bvniec\u012bbu - RB","og_description":"RB Rail AS ir ofici\u0101li uzs\u0101cis m\u0113nesi ilgu sarunu posmu ar visiem pretendentiem, kuri ir iesniegu\u0161i s\u0101kotn\u0113jos pied\u0101v\u0101jumus Rail Baltica vad\u012bbas, kontroles un signaliz\u0101cijas apak\u0161sist\u0113mas projekt\u0113\u0161anas un b\u016bvniec\u012bbas (D&B) iepirkum\u0101.","og_url":"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/","og_site_name":"RB","article_modified_time":"2025-08-21T15:44:51+00:00","og_image":[{"width":2048,"height":1152,"url":"https:\/\/www.railbaltica.org\/wp-content\/uploads\/2025\/07\/Rail-Baltica-visualisation-11.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/","url":"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/","name":"Norisin\u0101s sarunas ar pretendentiem par Rail Baltica dzelzce\u013ca signaliz\u0101cijas sist\u0113mas projekt\u0113\u0161anu un b\u016bvniec\u012bbu - RB","isPartOf":{"@id":"https:\/\/www.railbaltica.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/#primaryimage"},"image":{"@id":"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/#primaryimage"},"thumbnailUrl":"https:\/\/www.railbaltica.org\/wp-content\/uploads\/2025\/07\/Rail-Baltica-visualisation-11.jpg","datePublished":"2025-04-03T12:13:43+00:00","dateModified":"2025-08-21T15:44:51+00:00","breadcrumb":{"@id":"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/#breadcrumb"},"inLanguage":"lv-LV","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/"]}]},{"@type":"ImageObject","inLanguage":"lv-LV","@id":"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/#primaryimage","url":"https:\/\/www.railbaltica.org\/wp-content\/uploads\/2025\/07\/Rail-Baltica-visualisation-11.jpg","contentUrl":"https:\/\/www.railbaltica.org\/wp-content\/uploads\/2025\/07\/Rail-Baltica-visualisation-11.jpg","width":2048,"height":1152},{"@type":"BreadcrumbList","@id":"https:\/\/www.railbaltica.org\/lv\/jaunumi\/norisinas-sarunas-ar-pretendentiem-par-rail-baltica-dzelzcela-signalizacijas-sistemas-projektesanu-un-buvniecibu\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.railbaltica.org\/lv\/"},{"@type":"ListItem","position":2,"name":"Norisin\u0101s sarunas ar pretendentiem par Rail Baltica dzelzce\u013ca signaliz\u0101cijas sist\u0113mas projekt\u0113\u0161anu un b\u016bvniec\u012bbu"}]},{"@type":"WebSite","@id":"https:\/\/www.railbaltica.org\/#website","url":"https:\/\/www.railbaltica.org\/","name":"RB","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.railbaltica.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"lv-LV"}]}},"_links":{"self":[{"href":"https:\/\/www.railbaltica.org\/lv\/wp-json\/wp\/v2\/news\/15280","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.railbaltica.org\/lv\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.railbaltica.org\/lv\/wp-json\/wp\/v2\/types\/news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.railbaltica.org\/lv\/wp-json\/wp\/v2\/media\/15117"}],"wp:attachment":[{"href":"https:\/\/www.railbaltica.org\/lv\/wp-json\/wp\/v2\/media?parent=15280"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.railbaltica.org\/lv\/wp-json\/wp\/v2\/news_category?post=15280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}